Introduction of pulverized-coal injection at Yenakiieve Iron and Steel Works


如何引用文章

全文:

开放存取 开放存取
受限制的访问 ##reader.subscriptionAccessGranted##
受限制的访问 订阅存取

详细

The introduction of pulverized-coal injection at Yenakiieve Iron and Steel Works in 2016 is described. The state of the lining of the blast-furnace shaft and hearth is analyzed. Requirements regarding the charging conditions are proposed so as to improve the durability of the cooling system and ensure accident- free furnace operation.

作者简介

A. Podkorytov

Yenakiieve Iron and Steel Works

Email: yuriy.semenov.isi@gmail.com
乌克兰, Yenakiieve

A. Kuznetsov

Yenakiieve Iron and Steel Works

Email: yuriy.semenov.isi@gmail.com
乌克兰, Yenakiieve

A. Zubenko

Yenakiieve Iron and Steel Works

Email: yuriy.semenov.isi@gmail.com
乌克兰, Yenakiieve

Yu. Semenov

Iron and Steel Institute; Scientific Technical Company ISD

编辑信件的主要联系方式.
Email: yuriy.semenov.isi@gmail.com
乌克兰, Dnipro; Dnipro

A. Nesterov

Iron and Steel Institute

Email: yuriy.semenov.isi@gmail.com
乌克兰, Dnipro

E. Shumelchik

Iron and Steel Institute; Scientific Technical Company ISD

Email: yuriy.semenov.isi@gmail.com
乌克兰, Dnipro; Dnipro

补充文件

附件文件
动作
1. JATS XML

版权所有 © Allerton Press, Inc., 2017