Modern geothermal power: GeoPP with geothermal steam turbines
- Authors: Tomarov G.V.1, Shipkov A.A.1
-
Affiliations:
- Geoterm-EM, Moscow Company
- Issue: Vol 64, No 3 (2017)
- Pages: 190-200
- Section: Energy Conservation, New and Renewable Energy Sources
- URL: https://bakhtiniada.ru/0040-6015/article/view/172635
- DOI: https://doi.org/10.1134/S0040601517030089
- ID: 172635
Cite item
Abstract
The first part of the review presents information on the scale and specific features of geothermal energy development in various countries. The classification of geothermal power plant (GeoPP) process flow diagrams by a phase state of the primary heat source (a geothermal fluid), thermodynamic cycle, and applicable turbines is proposed. Features of geothermal plants using methods of flashing and steam separation in the process loop and a flowsheet and thermodynamic process of a geothermal fluid heat-to-power conversion in a GeoPP of the most widespread type using a double-flash separation are considered. It is shown that, for combined cycle power units, the specific power-to-consumption geothermal fluid ratio is 20–25% higher than that for traditional single-loop GeoPP. Information about basic chemical components and their concentration range for geothermal fluids of various formations around the world is presented. Three historic stages of improving geothermal energy technologies are determined, such as development of high-temperature geothermal resources (dry, superheated steam) and application of a two-phase wet-steam geothermal fluid in GeoPP power units with one or two expansion pressures and development of binary cycle GeoPPs. A current trend of more active use of binary power plants in GeoPP technological processes is noted. Design features of GeoPP’s steam turbines and steam separating devices, determined by the use of low-potential geothermal saturated steam as a working medium, which is characterized by corrosion aggressiveness and a tendency to form deposits, are considered. Most promising Russian geothermal energy projects are determined. A list of today’s most advanced geothermal turbine performance technologies is presented. By an example of a 25 MW steam turbine design, made by JSC Kaluga Turbine Works, advantages of the internal moisture separation with a special turbine-separator stage are shown.
About the authors
G. V. Tomarov
Geoterm-EM, Moscow Company
Author for correspondence.
Email: geotherm@gmail.com
Russian Federation, ul. Lefortovskii Val 24, Moscow, 111250
A. A. Shipkov
Geoterm-EM, Moscow Company
Email: geotherm@gmail.com
Russian Federation, ul. Lefortovskii Val 24, Moscow, 111250
Supplementary files
