Development and Pilot Testing of New Flow Diagrams for Plutonium Purification at the RT-1 Plant
- 作者: Bugrov K.V.1, Korotaev V.G.1, Korchenkin K.K.1, Logunov M.V.1, Lukin S.A.1, Mashkin A.N.1, Melent’ev A.B.1, Samarina N.S.1
-
隶属关系:
- PO Mayak
- 期: 卷 53, 编号 5 (2019)
- 页面: 925-932
- 栏目: Chemistry and Technology of Rare, Trace, and Radioactive Elements
- URL: https://bakhtiniada.ru/0040-5795/article/view/173162
- DOI: https://doi.org/10.1134/S0040579519050051
- ID: 173162
如何引用文章
详细
To modernize the extraction facility of the RT-1 plant, two flow diagrams for plutonium purification have been developed. In the first flow diagram, the Pu(IV)–Np(IV) valence pair is stabilized and both Pu and Np are stripped and, in the second flow diagram, the Pu(IV)–Np(V) valence pair is stabilized and only Pu is stripped. The problem of stabilizing the pair of the desired components in the required valence state is solved using reagents that had already been used at the RT-1 plant: hydrogen peroxide, hydrazine nitrate, and a catalyst (Fe). Both flow diagrams are adapted to the extraction facility of the plant with minimum changes in equipment and successfully pass extended process tests. As the result of this work, the volume and salt content of the raffinate are reduced.
作者简介
K. Bugrov
PO Mayak
Email: cpl@po-mayak.ru
俄罗斯联邦, Ozersk, Chelyabinsk oblast, 456780
V. Korotaev
PO Mayak
Email: cpl@po-mayak.ru
俄罗斯联邦, Ozersk, Chelyabinsk oblast, 456780
K. Korchenkin
PO Mayak
Email: cpl@po-mayak.ru
俄罗斯联邦, Ozersk, Chelyabinsk oblast, 456780
M. Logunov
PO Mayak
Email: cpl@po-mayak.ru
俄罗斯联邦, Ozersk, Chelyabinsk oblast, 456780
S. Lukin
PO Mayak
Email: cpl@po-mayak.ru
俄罗斯联邦, Ozersk, Chelyabinsk oblast, 456780
A. Mashkin
PO Mayak
编辑信件的主要联系方式.
Email: cpl@po-mayak.ru
俄罗斯联邦, Ozersk, Chelyabinsk oblast, 456780
A. Melent’ev
PO Mayak
编辑信件的主要联系方式.
Email: cpl@po-mayak.ru
俄罗斯联邦, Ozersk, Chelyabinsk oblast, 456780
N. Samarina
PO Mayak
Email: cpl@po-mayak.ru
俄罗斯联邦, Ozersk, Chelyabinsk oblast, 456780
补充文件
