Methodical Fundamentals for Constructing Startup Assignment Schedules for Combined-Cycle Power Plants Considering Damage Accumulation

Full Text

Open Access Open Access
Restricted Access Access granted
Restricted Access Subscription Access

Abstract

Depending on the requirements for power plants at thermal power stations (TPS), alternative approaches can be used for constructing assignment schedules to start power units from different initial thermal states. This issue becomes topical for combined-cycle power plants (CCPP) with heat-recovery steam generators (HRSG) whose thermal cycle includes gas turbines featuring excellent maneuverability and a steam system with equipment characterized by a relatively low loading rate. This paper examines an approach to construction of assignment schedules for CCPP starting based on accumulation of damages of the most heavily loaded thickwall elements in the steam path to meet the requirements for CCPP maneuverability during the entire service life of a CCPP. A principle is proposed for constructing an assignment schedule for starting a CCPP from any initial thermal state within the desired time provided that the number of these startups would not exceed the prescribed limit value determined in assessing the damage accumulation. Assignment schedules must be prepared based on the monitored temperature conditions of CCPP equipment, the allowable limits for predicted temperature stresses, and the allowable number of cycles determined by the low-cycle fatigue.

About the authors

Yu. A. Radin

All-Russia Thermal Engineering Institute

Email: kontorovich_ts@mail.ru
Russian Federation, Moscow, 115280

T. S. Kontorovich

All-Russia Thermal Engineering Institute

Author for correspondence.
Email: kontorovich_ts@mail.ru
Russian Federation, Moscow, 115280

V. B. Smyshlyaev

All-Russia Thermal Engineering Institute

Email: kontorovich_ts@mail.ru
Russian Federation, Moscow, 115280

Supplementary files

Supplementary Files
Action
1. JATS XML

Copyright (c) 2018 Pleiades Publishing, Inc.